The Piazzale Europa reclamation yard enters the phase of laying new sub-services and related connections.
The first phase involved the main construction of the yard, the treating of the trees and the tracking of existing sub-services (telephone, fiber, district heating, light, gas).
After the demolition and cuts in the existing structures, the second phase now covers the part of the plant with the realization of water and heat distribution works, technological centers including links, Serving the ex Reggiane area. In particular, all the first rainwater harvesting (in the picture the laying of the huge rainwater collection basin) and sewage systems has been redesigned. The area is also connected to the district heating network.
13 July 2017
2017